BRTS Project - Package Vlll

Construction of Bus Rapid Transit System (BRTS Project) for the Lahore-Ferozepur Road Corridor (Package-VIII). Construction of a 4-lane dual carriageway (asphalt work) on either side of the project, together with 2.4 kilometers of 2-lane BRTS road with a steel bar on both sides. Construction of Bus Stations, pedestrian bridges, underpasses, culverts, escalators installation, generators, transformers, panels, underground wiring, lighting poles, and removal of HT/LT cables, etc

Duration: August, 2012 to February 10, 2013
Client: TEPA / LDA