Toll Free+971 52 993 4234
Construction of Bus Rapid Transit System (BRTS Project) for Lahore-Ferozepur Road Corridor (Package-V). Construction of 3.9KM length of 2-Lane BRTS Road including steel bar on both sides, along-with 5-Lane dual carriageway (asphalt work) on each side of the project. Construction of Bus Stations, pedestrian bridges, underpass, culverts and installation of Escalators, Generators, Panels, Lighting Poles etc.