Toll Free+971 52 993 4234

Signal Free Corridor - Islamabad Highway

Constructed over a length of 04 km on either side with a 4-Lane on each side and grade-separated facility from Zero Point to Faizabad Interchange (Phase-I). Construction of an interchange at the I-8 Intersection in Islamabad is one of the remarkable projects, including underground electrification, HT/LT removals, and the installation of transformers, as well as a complete horticulture, landscaping, and storm water drainage system

Duration: June 30, 2015 to December 05, 2015 Capital
Client: Development Authority (CDA)